External Frescoes - 09/12/24
|
|
00001
Arrival Of Church Cupolas - 08/21/24
|
|
00002
Candle Factory Roof and Septic Work - 08/17/24
|
|
00003
Kitchen Equipment Upgrade - 08/03/24
|
|
00004
Continuation of Septic System Repairs - 08/03/24
|
|
00005
Replacement of Windows in Monastic Dorm - 08/03/24
|
|
00006
Flooring in Monastic Dormitory - 10/08/23
|
|
00007
Update on Work to Fix Water Entering Monastic Dorm - 08/06/23
Work has completed outside main dorm to water proof walls, repair plumbing lines, unblock drainage areas. We had had some heave rainfall the past week and we were glad to see that we were not flooded with water coming in. Hopefully this issues of water coing inot the basement has been resolved and we can begin to prepare to having areas fixed around lower store.
|
|
00008
Cathedral Exhaust Fans Replaced - 08/06/23
For the past couple of year the exhaust system for the cathedral was not working. A couple of weeks ago all the necessary repairs were made and old exhaust fans were replaced with new ones and control system rewired. |
|
00009
Planting of Tress - 05/27/23
Beginning in 2020, Bishop Luke has sponsored a property-wide bare-root seedling planting each spring, with this year's planting bringing up to 800 trees of different varieties planted around the property. 400 White Birch, 175 White Spruce, 50 White Pine, 50 Black Cherry, 50 Black Walnut, 50 American Elderberry, and 25 mixed stream buffer tree seedlings. In addition, this year a generous benefactor purchased 104 6yr old blue spruce to go around 3 sides of the new cemetery, in double rows, bringing the total planted to 904. Thanks again to the monastics, seminarians, and laymen who helped plant them and special thanks to the generous benefactor. |
|
00010
Planting of Trees in New Cemetery - 05/26/23
|
|
00011
|
00012
New Fence around Golgotha on the Hill - 02/27/23
|
|
00013
Cathedral Cupola Project - 02/27/23
|
|
00014
Bell Tower Repairs - 12/15/22
Repairs were made in the bell tower, replacing worn out ropes and fixing certain areas of the bell tower by a lay pilgrim with a background in electrical engineering who came to volunteer his services for a few days. |
|
00015
Repairing of Chimneys in Main Monastic Dorm - 12/03/22
|
|
00016
Replacement of Church Windows - 12/03/22
|
|
00017
Icon Studio Roof Replacement - 11/16/22
|
|
00018
Seminary Roof Replacement - 11/16/22
|
|
00019
Work on Fixing Broken Septic Systems - 11/16/22
Work is underway fixing our septic system for the Main Monastery Dormitory. |
|
00020
Bell Tower Restoration Work - 09/08/22
|
|
00021
Carpentry Workshop Replacement of Roof - 09/08/22
|
|
00022
Replacement of Crypt Doors - 09/08/22
|
|
00023
Side Entrance to Refectory Repairs - 09/08/22
|
|
00024
Removal of Dying Trees - 08/01/22
|
|
00025
Power Washing of Icon Studio - 07/14/22
|
|
00026
Tree Planting Along Robinson Road - 05/11/22
|
|
00027
New Wooden Floor Holy Trinity Cathedral - 05/11/22
A new wooden floor is being installed at Holy Trinity Monastery's Cathedral. |
|
00028
New Roof - Student Housing on Main Road in Jordanville - 05/11/22
|
|
00029
New Seminary Dorm Roof Installation - 05/10/22
|
|
00030
Expansion of Holy Trinity Church Supplies Store - 03/01/22
|
|
00031
Expansion of Candle Factory - 01/01/22
Candle factory was expanded to make room for new machines we hope to aquire in the near future. |
|